Once site prep, foundation work, and anchor bolts are set, the installation of a pre-engineered steel building package can begin. The framing system is erected first, then the insulation, roof and wall panels are installed, and finally, finishes such as trims, gutters, interior wall liner, windows, and doors are added. A qualified steel erection crew can often complete a mid-sized building in a matter of weeks.